  • Copper Concentrate Eti Bakır

    As Eti Bakir Co., we produce copper from our pits in Kure and Murgul and then enrich it at our flotation facilities to produce copper concentrates. The produced copper concentrates are then transported to Inebolu and Hopa Ports for shipment. Our copper concentrate production volume is 170.000 mt per year in our Kure plant and 130.000 mt per

  • Küre Plant Eti Bakır

    Today, the Eti Bakır A.Ş. Küre plant produces 1,000,000 tons of Raw Copper Ore, 90,000 tons of Copper Concentrate and 400,000 tons of Pyrite Concentrate every year through underground mining. It is planned that the copper produced at Küre will meet 8 to 9% of national demand. Together with the Murgul plant, this will meet 15% of the national demand.

  • Murgul Plant Eti Bakır

    Additionally, the Hydroelectric Power Plant (HPP) in Murgul Mine has 24.2 MW capacity and operates under our company which as the electricity generation licence. Eti Bakir Murgul Plant produces 3,500,000 mt all in copper ore and 130,000 mt copper concentrate per year.

  • History Eti Bakır

    •The modernization works of Eti Bakır Co. Samsun Smelter and electroylisis build up were finished . • Eti Copper Co. Samsun Smelter Electrolysis build up was finished and copper cathode production and sales started. • Mazıdağı Mine Facilities were acquired by Cengiz Holding. • The facility investments for Amonium Sulphate Fertilizer took place at Eti Bakır Co. Samsun Plant .

  • Eti Bakir Bus Ex

    So Eti Bakir mines copper in two similar mining regions. The Küre Mine of Eti Bakir is located in the northwestern part of Turkey, near the city of Kastamonu, close to the Black Sea. The Murgul Mine is operated in the far northeast of Turkey, close to the town Murgul in the province of the city of Artvin. The Küre Mine includes three open-pit mines as well as one underground mine. It is

  • About Us Eti Bakır

    Eti Bakır A.Ş. drilling operations for new ore reached 1,000 m as of the end of 2017 and R&D investments grew to USD 50 million, making a total of over USD 60 million of investment when added to the cost of other technology work. Eti Bakır A.Ş. was number 254 in the list of Top 500 Industrial Institutions in Turkey, compiled by the Istanbul Chamber of Industry in 2016. 2500 people are

  • Eti Bakır

    Eti Bakır; ülke ekonomisine ve gelişimine katkı sağlayan dev projeleri hayata geçirmeye, Türkiye için çalışıp üretmeye devam ediyor. İLETİŞİM. İstanbul Altunizade Kısıklı Cad. No: 37 34662 Üsküdar, İstanbul / TÜRKİYE Tel: +90 (216) 554 53 00 (Pbx) Faks: +90 (216) 474 97 30 474 11 22; Ankara Filistin Cad. Beyaz Zambaklar Sok. No:36 06700 Gaziosmanpaşa, Ankara

  • Eti Bakır

    Eti Bakır A.Ş. continues to invest to ensure a more efficient production process. As of the end of 2013, 546,400 meters of drilling was completed and R&D investments reached USD 50 million.With other investments, total amount reached USD 60 million.

  • ETİ BAKIR A.Ş. Cengiz Holding

    The open mine sites at the Eti Bakır A.Ş. Murgul Plant produce 3,200,000 tons of run-of-mine copper ore and 95,000 tons of copper concentrate every year. Power generation at the 25 MW Hydroelectric Power Plant is certified by the proper production license and there is ongoing work on modernization, increasing capacity and detecting new reserves. Copper ore from Murgul is converted to copper

  • STABILITY INVESTIGATION OF ETI COPPER MINE TAILINGS DAM

    but newly raised Eti Copper Mine tailings dam and alternative dam geometries for future raises. Plenty of methods were developed to analyze the reliability of structures; limit equilibrium methods, finite element methods and finite difference methods are among them. In this case, stability of the dam was analyzed with finite element method under static loading conditions. In order to determine

  • Eti Bakir A.S. Company Profile Turkey Financials & Key

    Eti Bakir A.S. was privatized in 2007 and became part of Cengiz Holding. The company is engaged in copper mining in Kure Kastamonu and Murgul Artvin facilities, also in copper smelting in its Samsun facilities and antimony mining in its Halikoy facilities. Headquarters Asikoy Mevkii Kure

  • Eti Bakir Samsun Sulphuric Acid

    Production of Copper and Pyrite Concentrate at Eti Copper Kastamonu Küre facilities are realized with an annual capacity of 1.000.000 tons touvenant ore, 90.000 tons Copper Concentrate and 400.000 tons Pyrite Concentrate and The Murgul plant extracts raw copper ore over 2.700.000 tons per year through 3 open mines, and processes to produce 75.000 tons of copper concentrate per year for supply

  • ETİ BAKIR A.Ş. Cengiz Holding

    The open mine sites at the Eti Bakır A.Ş. Murgul Plant produce 3,200,000 tons of run-of-mine copper ore and 95,000 tons of copper concentrate every year. Power generation at the 25 MW Hydroelectric Power Plant is certified by the proper production license and there is ongoing work on modernization, increasing capacity and detecting new reserves. Copper ore from Murgul is converted to copper

  • STABILITY INVESTIGATION OF ETI COPPER MINE TAILINGS DAM

    but newly raised Eti Copper Mine tailings dam and alternative dam geometries for future raises. Plenty of methods were developed to analyze the reliability of structures; limit equilibrium methods, finite element methods and finite difference methods are among them. In this case, stability of the dam was analyzed with finite element method under static loading conditions. In order to determine

  • Çayeli Bakır İşletmeleri

    Çayeli Bakır is located on the Black Sea coast of Turkey approximately 7 kilometers inland from the coastal town of Çayeli and adjacent to the town of Madenli. For over 20 years Çayeli Bakır has produced copper and zinc concentrates from our underground mine that we market and ship to our customers throughout the world. more

  • ETI BAKIR ANONIM SIRKETI Company Profile Kastamonu

    ETI COPPER. ASIKOY MEVKII. KURE. 37902, Kastamonu Turkey +90-3667512060. Company Type: Anonim Sirketi Subsidiary. HOME > BUSINESS DIRECTORY > MANUFACTURING > PRIMARY METALS MANUFACTURING > TURKEY > KASTAMONU > ETI BAKIR ANONIM SIRKETI; Company Profile. Unlock more with a D&B Hoovers FREE Trial. On this page. Financial Statements; Credit

  • Eti Bakir Samsun YouTube

    13/08/2016· This video is unavailable. Watch Queue Queue. Watch Queue Queue

  • Eti Bakır Mining Turkey Discover The Turkish Mining

    Tag: Eti Bakır. The Biggest Investment in Eastern Turkey: Mazıdağı Metal Recovery and Integrated June 19, 2019. $270 million will be Contributed to the Economy Through Recycling of May 8, 2019. Ropeway is Used for Material Transportation in Cerattepe Copper Mine. February 13, 2018. Mining-Turkey is the digital mining news service about Turkish Mining Industry. Discover The

  • MINING Cengiz Holding

    Carrying out drilling works of over 100,000 m a year to locate new mineral ores and improve current ones, Cengiz Holding also plans to purchase mines and enter into partnerships abroad. Cengiz Holding’s mining and metallurgy operations continue at the copper, aluminum, antimony and phosphate rock sites. The operations started with the acquisition of Eti Bakır Küre Plant and Eti Bakır

  • ETİ BAKIR YouTube